@  vet201060 : (28 August 2014 - 09:55 PM) Va Is So Shameful!!
@  artlouis : (27 August 2014 - 11:36 AM) Code 7019
@  vet201060 : (26 August 2014 - 11:41 PM) Damn Post It Notes
@  vet201060 : (26 August 2014 - 11:41 PM) True That
@  Asiadaug : (26 August 2014 - 07:46 PM) I Have Yet To Deal With Any Piece Of Va That Isn't A Dysfunctional Mess...ebenefits, Claim Filing, Billing...and To Think Our Tax Dollars Are Used To Perpetuate That Calamity!
@  carlie : (26 August 2014 - 05:39 PM) notorious kelly - loved your shout ! ! !
@  GlassRose1500 : (26 August 2014 - 03:40 PM) Would Someone Add Smc Housbound Plus Smc A&a Regular And One Smc K For Me? I Can't Seem To Do That Math!
@  Notorious Kelly : (26 August 2014 - 03:12 PM) Ebenefits Is Not A Thermometer In The Rectum Of Your Claim; It Is A Post-It Note That May Or Not Be Updated Or Accurate. Try Not To Obsess ;)
@  mcassidy : (26 August 2014 - 01:25 PM) Osa
@  Jaluluah11B : (26 August 2014 - 10:05 AM) My Reconsideration Finally Showed Up On Ebenefits As A New Claim.  gathering Evidence.  [font=Arial][size=3]Automated 5103 Notice Response Needed. [/size][/font]
@  vet201060 : (26 August 2014 - 10:00 AM) Went From Pending Decision Approval To Review Of Evidence Today, I Need To Stop Looking At It. Drives You Crazy Waiting
@  GlassRose1500 : (25 August 2014 - 09:30 PM) @coriemboh I Get My Best Claim Advice Here, But My Dav Guy Gets The Best Intel Once The Claim Is Filed
@  coriemboh : (25 August 2014 - 08:57 PM) The Average Processing Time Is 9 Months More Or Less. Every Time I Call The 800#, I Get A Different Answer. Goe, Roe....make Up Your Mind!
@  coriemboh : (25 August 2014 - 08:56 PM) I Just Want To Know Ballpark Figure Of How Much Longer My Claim Will Take. The Bills Are Piling Up. Adds To My Anxiety And Depression. Sure Wish I Could Tell Bill Collectors The Same Things Va Tells Me!
@  coriemboh : (25 August 2014 - 08:54 PM) @glassrose1500-No, I Don't. I Put In For Representation A Few Days Ago, But I'm Sure That End Won't Pan Out Until The Claim Is Closed.
@  GlassRose1500 : (25 August 2014 - 12:11 PM) Would Appreciate Feedback On My Smc Draft - Posted In The Smc Section! Tkx!
@  GlassRose1500 : (25 August 2014 - 12:04 PM) @coriemboh - Do You Have A Service Rep You Can Call? They Usually Have More Info...
@  coriemboh : (25 August 2014 - 11:16 AM) Called The 800 # To Check Status Of Claim. Really Frustrated With The Lack Of Information.
@  vet201060 : (25 August 2014 - 10:12 AM) Just Checked Ebenefits And Claim Was Pending Decision Approval And Then Checked Few Minutes After That And Now Prep For Decision. Drives Me Crazy
@  coriemboh : (24 August 2014 - 10:00 PM) Anyone Else Having A Hard Time With Evet Updates? Mine Is Taking Forever!

Photo
- - - - -

New Or Reopen Claims?


This topic has been archived. This means that you cannot reply to this topic.
5 replies to this topic

#1 Markn123

 
Markn123

    E-3 Seaman

  • Seaman
  • PipPipPip
  • 24 posts
 

Posted 22 July 2012 - 06:55 PM

I am currently 80% Permanent and Total IU and I filed several claims about 7 years that were denied because the VA said they were not service connected. The claims were for GERD and Bi-Lateral Peripheral Neuropathy (not diabetic). The PN was diagnosed by the VA in 2004 and I am also being treated for Gerd. I am sure they are both related to the contaminated water at Camp Lejeune ( was there 1982-84)and was wondering should I file to reopen these claims because of this new evidence. Could these claims could aid in the future for SMCs or getting schedular 100% or could this cause the VA to re-look at my IU conditions.

Advertise Here

 

#2 Gulfvet45

 
Gulfvet45

    E-5 Petty Officer 2nd Class

  • Chief Petty Officers
  • PipPipPipPipPip
  • 226 posts
 

Posted 23 July 2012 - 09:59 AM

no matter what you do they will look at every thing again.
As for the GERD you might get 10%. hard to say without knowing what else you have. if you have some other GI disorder that is in the same list you m\most likely will not get anything.
The PN you may want to look up if it even is on the list. next it cannot be from something else. nerve blockage, DJD DDD and at 10% or more.

#3 carlie

 
carlie

    Moderator/Admin/HadIt.com Elder/SVR Radio Panelist

  • Admin
  • PipPipPipPipPipPipPipPipPipPip
  • 22036 posts
 

Posted 23 July 2012 - 10:04 AM

I am currently 80% Permanent and Total IU and I filed several claims about 7 years that were denied because the VA said they were not service connected. The claims were for GERD and Bi-Lateral Peripheral Neuropathy (not diabetic). The PN was diagnosed by the VA in 2004 and I am also being treated for Gerd. I am sure they are both related to the contaminated water at Camp Lejeune ( was there 1982-84)and was wondering should I file to reopen these claims because of this new evidence. Could these claims could aid in the future for SMCs or getting schedular 100% or could this cause the VA to re-look at my IU conditions.

YES

#4 Markn123

 
Markn123

    E-3 Seaman

  • Seaman
  • PipPipPip
  • 24 posts
 

Posted 23 July 2012 - 02:33 PM

Thanks GulfVet45 and Carlie and everyone else who this post may help.

#5 Joep

 
Joep

    E-3 Seaman

  • Seaman
  • PipPipPip
  • 13 posts
 

Posted 08 August 2012 - 11:02 PM

Today's paper showed the president signing into law the Camp Lejeune contanimated water VA benefits. If you have not done so already, go ahead and submit now.

#6 Berta

 
Berta

    HadIt.com Elder/SVR Radio Panelist

  • SVR
  • PipPipPipPipPipPipPipPipPipPip
  • 28621 posts
 

Posted 09 August 2012 - 06:34 AM

Absolutely.

Here is link to the first Camp Le Jeune Bad Water vet's award:



http://www.hadit.com...-lejeune-award/

It includes the Le Jeune Training letter too.

Also if one searches hadit under Camp Le Jeune, further discussions will pop up on this serious issue.




Advertise Here